Modeling was performed for solar thermal-biomass hybridization for power generation.
-
Increment in capacity reduces the solar collector area per MW to 5,000 m2 (20 MW).
-
Annual biomass requirement per MW reduced to 1600 tonnes at 20 MW scale.
-
Hybrid mode of operation increases the plant capacity utilization from 23% to 47%.
-
Cost of electricity by the hybrid plant is INR 6/kWh for plant capacities >5 MW.